This was a major reconditioning of our water inlet pipe from #4 pond and the 15 foot deep 72" wide vertical shaft that the pond water flows into and our irrigation pumps pump out of. The original galvanized piping was put in in 1987 and had corroded due to the high sodium chloride content of the water, the salt comes from run-off water from Interstate-I-94 and the residental streets to the east and north of the course. The sleeving material we used has been used by the Wisconsin Highway Department for the last 5 years to sleeve piping under highways it is made of a high density plastic composite material that will not corrode. We were able to do this whole project for $44,000 the alternative to the sleeving was to dismantle the pumphouse, breakup the concrete floor, digout the corroded piping, install the new piping, recement the floor and rebuild the pumphouse. Easily, this method would have cost more than $100,000 and taken much longer to complete. This was the first time this composite sleeving method was used for a wet-well and intake pipe in Wisconsin.
Subscribe to:
Post Comments (Atom)
1 comment:
Global chemical industry is about 1.5 trillion dollar industry and global composite Materials industry is over $65 billion dollar industry. Given the size of the market and its prospects for further expansion, the chemical and composites industry represent an attractive opportunity for industry players. We offer composite materials for aerospace, automotive, pipe and tank, construction and wind energy industries. Our composites industry represents an attractive opportunity for OEMs and material suppliers.
Post a Comment